NCCCO ARTICULATING BOOM CRANE

QUESTIONS AND CORREC T DETAILED

ANSWERS (VERIFIED ANSWERS)|ALREADY

GRADED A+||BRAND NEW!!

Question 1: When setting up the ABC crane and using the

stabilizers, when would cribbing be required?

  • Loamy soil
  • Sandy soil
  • Unstable soil
  • All of the above

CORRECT ANSWER : D. All of the above

Question 2: What is the required clearance per ASME for a

power line rated at 150 KV?

  • 10 feet
  • 15 feet
  • 20 feet
  • 25 feet

CORRECT ANSWER : B. 15 feet

  • | Page

Question 3: When attaching a shackle to a crane hook, which

part of the shackle goes to the load?

  • The pin
  • The ear
  • The bow
  • The shank

CORRECT ANSWER : C. The bow

Question 4: What is the definition of the gross capacity?

  • Weight of load
  • Weight of rigging
  • Weight of the block and ball
  • The capacity listed on the crane load chart

CORRECT ANSWER : D. The capacity listed on the crane load

chart

Question 5: When using a manual boom extension, you are

required to:

  • | Page
  • Not exceed the rating of the extension, regardless of the
  • radius or the amount of boom extension

  • Ensure it is painted orange
  • Is stamped as to capacity
  • Has been load tested

CORRECT ANSWER : A. Not exceed the rating of the

extension, regardless of the radius or the amount of boom extension

Question 6: If the crane is in use with a manual boom extension

and it is not being used, what must you deduct to determine net capacity?

  • Weight of the crane
  • Weight of the extension
  • Weight of the boom
  • Weight of hook

CORRECT ANSWER : B. Weight of the extension

  • | Page

Question 7: The gross capacity minus the lifting deductions

equals:

  • Gross load
  • Net load
  • Gross capacity
  • Net capacity

CORRECT ANSWER : D. Net capacity

Question 8: What does the term "interpolation of the load chart"

mean?

  • Reading the chart from left to right
  • Reading the top (structural) part of the load chart
  • Estimating the gross capacity in between two stated values
  • Guessing the estimated capacity

CORRECT ANSWER : C. Estimating the gross capacity in

between two stated values

Question 9: How often are crane hooks required to be inspected?

  • Daily

Download Study Material

Buy This Study Material

$30.00
Buy Now
  • Immediate download after payment
  • Available in the pdf format
  • 100% satisfaction guarantee

Study Material Information

Category: Construction and Industry
Description:

NCCCO ARTICULATING BOOM CRANE QUESTIONS AND CORREC T DETAILED ANSWERS (VERIFIED ANSWERS)|ALREADY GRADED A+||BRAND NEW!! Question 1: When setting up the ABC crane and using the stabilizers, when wou...

Purchase PDF $30.00
Gaviki.com is an independent educational platform providing practice exams and study resources. Our materials are developed through independent research by our education team. We are not affiliated with, authorized by, or endorsed by any official exam testing facilities, certification boards, or exam sponsors. Any trademarks or exam names mentioned are for identification purposes only.